Warning: JavaScript is not enabled or not loaded. Please enable JavaScript for the best experience.

Copper is the New Oil

MYRES GLOBAL GROUP · TANZANIA

Building Scalable Copper & Gold Concentrate Production in Tanzania

Myres Global Group has secured a portfolio of 74 Primary Mining Licences (PMLs) across Tanzania, in partnership with established local licence holders and operating teams.

Each licence averages approximately 9 hectares, representing a combined footprint of ~666 hectares positioned for staged development and structured scale-up. covering a diversified critical minerals portfolio with a primary focus on copper and gold.

We are advancing these assets through disciplined technical planning, early operational integration, and a clear pathway to copper and gold concentrate production.

Our strategy emphasizes institutional-grade governance, repeatable execution, and long-term offtake alignment with international counterparties.

Mbesa Copper-Gold Project

Offtake Status Secured · Hong Kong Buyer
Processing Flotation + Expansion Engineering
Copper Grade
5–20%
Gold Grade
3–7 g/t
Scale Plan
100 → 2,000 TPD

Key Metrics

Indicators of scalable production and commercial readiness

Mbesa’s grades, throughput, and secured offtake position the project for disciplined growth from pilot operations to institutional-scale production.

NI 43-101 planning in progress

Copper Grades

5–20%

High-grade oxide and sulphide zones supporting premium concentrate output.

Gold Grades

3–7 g/t

Gold  & Sliver credits strengthen project economics and offtake attractiveness.

Planned 100 TPD pilot plant

100 TPD

 as the initial production phase, incorporating flotation processing for copper-gold concentrate output.”

Planned Expansion

2,000 TPD

Scalable throughput aligned with infrastructure and market demand.

Offtake Status

International Buyer

Committed offtake with a Hong Kong counterparty supports financing readiness.

Mbesa Copper-Gold Project · Tanzania

Project Overview: Scalable Production Built on Strong Grades

Mbesa is a copper-gold development with measured grades ranging from 5–20% copper and 3–7 g/t gold. The project is structured for rapid scale-up through phased processing, anchored by a 100 TPD plant and a clear pathway to a 2,000 TPD expansion.

Resource Development & NI 43-101 Plan 2027

Drilling and geological modeling are aligned with a NI 43-101 compliant resource pathway, ensuring investment-grade reporting standards and a robust basis for reserve conversion.

Processing Strategy & Flotation Relevance Plan

A flotation plant is central to concentrate production, optimizing recovery and enabling consistent offtake delivery. The flowsheet prioritizes scalable throughput while preserving grade control across ore zones.

Current Setup & Growth Pathway

The existing 100 TPD operation provides immediate production data and operational learning. Expansion to 2,000 to 5000 TPD is engineered as a modular upgrade, supported by secured offtake with an international buyer in Hong Kong.

Institutional capabilities across the mining value chain

We deliver disciplined project execution, structured commercial frameworks, and buyer-led market access to scale copper-gold production in Tanzania.

Mbesa-aligned operating model

Mining Project Development

Integrated development from resource definition to plant execution, aligning geology, metallurgy, and operating plans for scalable production growth.

Operational involvement

Commodity Structuring

Commercial structuring across concentrate and dore, designed to optimize cash conversion, compliance, and institutional-grade transaction security.

Structured offtake terms

Offtake Facilitation

Direct access to international buyers, securing liquidity and price certainty with documented delivery schedules and quality assurance.

Global buyer access

Strategic Partnerships

Joint-venture and funding pathways built for disciplined governance, aligned incentives, and shared upside across the project lifecycle.

Institutional alignment

About Myres Global Group

Building a Tanzanian Copper & Gold Platform at Scale

Myres Global Group operates in collaboration with established local partners and licence holders across a portfolio of 74 Primary Mining Licences (PMLs) in Tanzania. Each licence covers approximately 9 hectares, representing a combined land area of roughly 666 hectares of licensed mining area supporting a scalable copper and gold development platform.

Through these partnerships, we advance resources with structured operations, compliant development, and disciplined execution to build long-term supply capability.

Portfolio Foundation

74 PMLs spanning approximately 666 hectares, providing depth, optionality, and institutional-grade scale.

Structured Advancement

Disciplined planning and operational development to move assets from definition through production readiness.

Local Collaboration

Active collaboration with established licence holders to ensure compliant, scalable execution across the portfolio.

Sustainable Supply

A long-term model anchored in verified resources, secure partnerships, and consistent production discipline.

Mineral Portfolio

Institutional portfolio built for copper & gold scale, with diversified strategic mineral exposure

Myres Global Group manages a technically screened licence platform across Tanzania’s high-prospectivity corridors. The portfolio is structured for resource optionality, disciplined capital deployment, and long-term development with commercial relevance to global metals and energy-transition supply chains.

Primary Production Focus

Copper & Gold

Mbesa anchors the platform with high-grade copper and gold, a near-term processing base, secured offtake, and a scalable development path aligned to institutional growth capital.

Prospectivity-led selection Commercial relevance Resource optionality

Investment Rationale

Institutional Fit

Diversified 76 PMLs licences coverage centers on copper and gold production while adding upside from strategic and energy-transition minerals. This structure delivers long-term resource optionality, exposure to global supply-chain demand, and a portfolio profile aligned to institutional capital and strategic partners.

Primary Focus

Copper & Gold

Core cash-flow drivers with high-grade upside. Gold & Sliver credits 

Strategic Upside

Energy-Transition

Lithium, nickel, graphite, and optionality.

Institutional Lens

Scalable Platform

Structured for disciplined deployment and partnerships.

28 PMLs Copper & Gold  252 hectares

Primary

High-grade copper with gold credits in scalable systems, delivering base-metal exposure and precious-metal upside for institutional production growth.

Lithium

Battery-grade mineral exposure aligned to energy-transition demand, with optionality for future offtake structures.

Nickel & Zinc

Base-metal exposure with relevance to stainless steel and battery supply chains, supporting diversified processing pathways.

Silver

Associated precious-metal mineralisation with commercial upside and hedge characteristics within copper-gold systems.

Tantalum / Coltan

Strategic mineral upside tied to electronics supply chains and high-value concentrate markets.

Graphite & Beryllium

Energy-transition and advanced manufacturing inputs offering strategic optionality across secure supply initiatives.

Coal

Thermal and industrial coal opportunities aligned to regional power and processing demand, with disciplined development criteria.

Feldspar & Industrial Minerals

Industrial mineral applications for ceramics, glass, and regional processing, underpinning stable revenue diversification.

Flagship Project

Mbesa Copper–Gold Project Snapshot

A scalable, production-focused asset in Tanzania with secured offtake and a clear path from current output to institutional-scale capacity. Myres Global Group operates alongside established local partners and licence holders across a portfolio of 74 Primary Mining Licences (PMLs), each covering approximately 9 hectares, representing ~666 hectares of licensed ground that underpins broader resource advancement and long-term copper-gold supply capability. 

The Mbesa Project is strategically located in Tanzania within a prospective extension of the Central African Copperbelt, one of the world’s most significant copper-producing regions. This geological setting is known for hosting high-grade copper and copper–gold deposits, supporting long-term exploration and development potential.
The project benefits from favourable regional infrastructure and access to established export routes, positioning it well for efficient movement of concentrate to international markets.roject is strategically located with access to key export routes, approximately 850–1,250 km from Dar es Salaam Port and 380 –600 km from Mtwara Port. This provides flexible and efficient logistics for exporting copper–gold concentrate to international markets.

Copper Grade
5–20%
Gold Grade
3–7 g/t
Offtake Secured International buyer in Hong Kong

Processing flows through a flotation plant with upgrade potential and a NI 43-101 aligned resource development plan.

Location

Tanzania — Mbesa Corridor

East Africa

Access & logistics Established

Regulatory posture Aligned

Planned Production Profile

Operating 100 TPD plant with stable copper-gold concentrate output.

Current plant100 TPD

ProcessingFlotation

Growth Plan

Scalable expansion targeting industrial throughput with modular deployment.

Vision2,000 TPD

PathwayPhased build-out

Project Highlights

  • High-grade copper-gold zones with strong upside.
  • International offtake agreement 
  • 74 PML portfolio (~666 hectares) with local licence-holder partners.

Investment opportunity

Institutional-scale copper & gold platform in Tanzania

Mbesa is a board-ready, production-led asset with secured offtake and a defined growth pathway from 100 TPD to 2,000 TPD. Myres Global Group operates in partnership with established local licence holders across 74 Primary Mining Licences (PMLs), each approximately 9 hectares, representing roughly 666 hectares of licensed ground that underpins broader resource advancement, long-term copper-gold supply capability, and scalable capital deployment.

Offtake secured

Executed international offtake with a Hong Kong buyer, establishing revenue visibility and bankability for capital providers.

Scalable model

Phased expansion roadmap from 100 TPD to 2,000 TPD with disciplined capex sequencing, operational integration, and flotation uplift.

NI 43-101 plan

Independent reporting framework advancing to formalize resources, upgrade studies, and enhance institutional confidence.

Upside potential

High-grade copper (5–20%) with gold by-product credits (3–7 g/t) supports resilient economics and durable optionality.

Investment highlights

  • 74 PMLs with ~666 hectares of licensed ground supporting institutional-grade resource development.
  • Secured offtake with a Hong Kong buyer provides near-term revenue visibility.
  • Copper-gold concentrate focus with high-grade feed supporting strong margins.
  • Export access via Dar es Salaam and Mtwara ports with established logistics corridors.
  • Scalable production path from 100 TPD to 2,000 TPD with phased capital deployment.

Location & regional advantage

The Mbesa Project is situated within a prospective extension of the Central African Copperbelt, a globally significant copper-producing region known for high-grade copper and copper-gold deposits. The site benefits from favorable regional infrastructure and access to established export routes, with approximate logistics distances of 850–1,250 km to Dar es Salaam Port and 380–600 km to Mtwara Port, enabling efficient export of copper-gold concentrate to international markets.

Credibility & execution

Jurisdiction

Tanzania mining corridor

Operating partners

Local licence holders & teams

Licence footprint

74 PMLs / ~666 hectares

Export logistics

Dar & Mtwara port access

Board-level materials available for strategic partners and institutional capital providers.

Project dashboard

Mbesa production scale-up

2026–2028

Phase 1 — Commissioning & Production Stabilisation (100 TPD)

In progress

Deployment and commissioning of a 100 TPD processing plant, targeting stable throughput, optimized recovery rates, and consistent copper-gold concentrate output.

Phase 2 — Flotation expansion (500 TPD)

In progress

Engineering and procurement for flotation plant expansion and throughput uplift.

Phase 3 — 2,000 TPD scale copper & gold plant

Planned

Final investment decision aligned with offtake execution and NI 43-101 completion.

Offtake

Hong Kong buyer

Product

Copper-gold concentrate

Expansion target

2,000 TPD

Scale-up timeline

Path to institutional-scale capacity

2024–2028
  1. Current production — 100 TPD

    Steady-state commissioning and optimized recovery, building operating history.

  2. Scale-up — 500 TPD flotation uplift

    Capital deployment for expanded throughput, improving concentrate volume and margin.

  3. Institutional scale — 2,000 TPD plant

    NI 43-101 completion and offtake execution support a full-scale copper-gold facility.

Institutional Contact

Board-level engagement for strategic capital, offtake structures, and long-term partnership execution.

Myres Global Group invites dialogue with institutional investors, strategic partners, and capital providers seeking scalable copper-gold exposure in Tanzania. We provide structured access to the Mbesa project, aligned governance, and disciplined execution.

Direct Contact

Email [email protected]

WhatsApp +447378390658

Preferred Topics

  • Mbesa project diligence
  • Offtake & commercial structuring
  • Growth capital & expansion mandate
  • Strategic operating partnerships

Submit an inquiry

Confidential

Provide your mandate and interest profile to receive the investor deck, project documentation, and meeting availability with leadership.

Institutional engagement only — structured, discreet, and execution-led.

Executive responses within standard business timelines. Confidential review guaranteed.