Resource Development & NI 43-101 Plan 2027
Drilling and geological modeling are aligned with a NI 43-101 compliant resource pathway, ensuring investment-grade reporting standards and a robust basis for reserve conversion.
Key Metrics
Mbesa’s grades, throughput, and secured offtake position the project for disciplined growth from pilot operations to institutional-scale production.
Copper Grades
High-grade oxide and sulphide zones supporting premium concentrate output.
Gold Grades
Gold & Sliver credits strengthen project economics and offtake attractiveness.
Planned 100 TPD pilot plant
as the initial production phase, incorporating flotation processing for copper-gold concentrate output.”
Planned Expansion
Scalable throughput aligned with infrastructure and market demand.
Offtake Status
Committed offtake with a Hong Kong counterparty supports financing readiness.
Mbesa Copper-Gold Project · Tanzania
Mbesa is a copper-gold development with measured grades ranging from 5–20% copper and 3–7 g/t gold. The project is structured for rapid scale-up through phased processing, anchored by a 100 TPD plant and a clear pathway to a 2,000 TPD expansion.
Drilling and geological modeling are aligned with a NI 43-101 compliant resource pathway, ensuring investment-grade reporting standards and a robust basis for reserve conversion.
A flotation plant is central to concentrate production, optimizing recovery and enabling consistent offtake delivery. The flowsheet prioritizes scalable throughput while preserving grade control across ore zones.
The existing 100 TPD operation provides immediate production data and operational learning. Expansion to 2,000 to 5000 TPD is engineered as a modular upgrade, supported by secured offtake with an international buyer in Hong Kong.
We deliver disciplined project execution, structured commercial frameworks, and buyer-led market access to scale copper-gold production in Tanzania.
Integrated development from resource definition to plant execution, aligning geology, metallurgy, and operating plans for scalable production growth.
Commercial structuring across concentrate and dore, designed to optimize cash conversion, compliance, and institutional-grade transaction security.
Direct access to international buyers, securing liquidity and price certainty with documented delivery schedules and quality assurance.
Joint-venture and funding pathways built for disciplined governance, aligned incentives, and shared upside across the project lifecycle.
About Myres Global Group
Myres Global Group operates in collaboration with established local partners and licence holders across a portfolio of 74 Primary Mining Licences (PMLs) in Tanzania. Each licence covers approximately 9 hectares, representing a combined land area of roughly 666 hectares of licensed mining area supporting a scalable copper and gold development platform.
Through these partnerships, we advance resources with structured operations, compliant development, and disciplined execution to build long-term supply capability.
74 PMLs spanning approximately 666 hectares, providing depth, optionality, and institutional-grade scale.
Disciplined planning and operational development to move assets from definition through production readiness.
Active collaboration with established licence holders to ensure compliant, scalable execution across the portfolio.
A long-term model anchored in verified resources, secure partnerships, and consistent production discipline.
Operational visuals, site activity, processing progress, and field execution from the Mbesa copper-gold program.
Mineral Portfolio
Myres Global Group manages a technically screened licence platform across Tanzania’s high-prospectivity corridors. The portfolio is structured for resource optionality, disciplined capital deployment, and long-term development with commercial relevance to global metals and energy-transition supply chains.
Primary Production Focus
Copper & GoldMbesa anchors the platform with high-grade copper and gold, a near-term processing base, secured offtake, and a scalable development path aligned to institutional growth capital.
Investment Rationale
Institutional FitDiversified 76 PMLs licences coverage centers on copper and gold production while adding upside from strategic and energy-transition minerals. This structure delivers long-term resource optionality, exposure to global supply-chain demand, and a portfolio profile aligned to institutional capital and strategic partners.
Primary Focus
Copper & Gold
Core cash-flow drivers with high-grade upside. Gold & Sliver credits
Strategic Upside
Energy-Transition
Lithium, nickel, graphite, and optionality.
Institutional Lens
Scalable Platform
Structured for disciplined deployment and partnerships.
High-grade copper with gold credits in scalable systems, delivering base-metal exposure and precious-metal upside for institutional production growth.
Battery-grade mineral exposure aligned to energy-transition demand, with optionality for future offtake structures.
Base-metal exposure with relevance to stainless steel and battery supply chains, supporting diversified processing pathways.
Associated precious-metal mineralisation with commercial upside and hedge characteristics within copper-gold systems.
Strategic mineral upside tied to electronics supply chains and high-value concentrate markets.
Energy-transition and advanced manufacturing inputs offering strategic optionality across secure supply initiatives.
Thermal and industrial coal opportunities aligned to regional power and processing demand, with disciplined development criteria.
Industrial mineral applications for ceramics, glass, and regional processing, underpinning stable revenue diversification.
Flagship Project
A scalable, production-focused asset in Tanzania with secured offtake and a clear path from current output to institutional-scale capacity. Myres Global Group operates alongside established local partners and licence holders across a portfolio of 74 Primary Mining Licences (PMLs), each covering approximately 9 hectares, representing ~666 hectares of licensed ground that underpins broader resource advancement and long-term copper-gold supply capability.
Processing flows through a flotation plant with upgrade potential and a NI 43-101 aligned resource development plan.
Location
Access & logistics Established
Regulatory posture Aligned
Operating 100 TPD plant with stable copper-gold concentrate output.
Current plant100 TPD
ProcessingFlotation
Scalable expansion targeting industrial throughput with modular deployment.
Vision2,000 TPD
PathwayPhased build-out
Investment opportunity
Mbesa is a board-ready, production-led asset with secured offtake and a defined growth pathway from 100 TPD to 2,000 TPD. Myres Global Group operates in partnership with established local licence holders across 74 Primary Mining Licences (PMLs), each approximately 9 hectares, representing roughly 666 hectares of licensed ground that underpins broader resource advancement, long-term copper-gold supply capability, and scalable capital deployment.
Executed international offtake with a Hong Kong buyer, establishing revenue visibility and bankability for capital providers.
Phased expansion roadmap from 100 TPD to 2,000 TPD with disciplined capex sequencing, operational integration, and flotation uplift.
Independent reporting framework advancing to formalize resources, upgrade studies, and enhance institutional confidence.
High-grade copper (5–20%) with gold by-product credits (3–7 g/t) supports resilient economics and durable optionality.
The Mbesa Project is situated within a prospective extension of the Central African Copperbelt, a globally significant copper-producing region known for high-grade copper and copper-gold deposits. The site benefits from favorable regional infrastructure and access to established export routes, with approximate logistics distances of 850–1,250 km to Dar es Salaam Port and 380–600 km to Mtwara Port, enabling efficient export of copper-gold concentrate to international markets.
Jurisdiction
Tanzania mining corridor
Operating partners
Local licence holders & teams
Licence footprint
74 PMLs / ~666 hectares
Export logistics
Dar & Mtwara port access
Project dashboard
Phase 1 — Commissioning & Production Stabilisation (100 TPD)
In progressDeployment and commissioning of a 100 TPD processing plant, targeting stable throughput, optimized recovery rates, and consistent copper-gold concentrate output.
Phase 2 — Flotation expansion (500 TPD)
In progressEngineering and procurement for flotation plant expansion and throughput uplift.
Phase 3 — 2,000 TPD scale copper & gold plant
PlannedFinal investment decision aligned with offtake execution and NI 43-101 completion.
Offtake
Hong Kong buyer
Product
Copper-gold concentrate
Expansion target
2,000 TPD
Scale-up timeline
Current production — 100 TPD
Steady-state commissioning and optimized recovery, building operating history.
Scale-up — 500 TPD flotation uplift
Capital deployment for expanded throughput, improving concentrate volume and margin.
Institutional scale — 2,000 TPD plant
NI 43-101 completion and offtake execution support a full-scale copper-gold facility.
Myres Global Group invites dialogue with institutional investors, strategic partners, and capital providers seeking scalable copper-gold exposure in Tanzania. We provide structured access to the Mbesa project, aligned governance, and disciplined execution.
Email [email protected]
WhatsApp +447378390658
Provide your mandate and interest profile to receive the investor deck, project documentation, and meeting availability with leadership.
Institutional engagement only — structured, discreet, and execution-led.